NextGenEnergyJobsRenewable Energy Jobs
CompaniesCitiesIndustries

NextGenEnergyJobs

The #1 platform for renewable energy careers. Join thousands of professionals who've found their dream jobs in renewable energy, sustainability, and renewable tech.

0+Newsletter subscribers
25K+Jobs posted
100+Companies

Sustainability Partners

Sustainability Software DirectoryRefurbished Tech Guide

Find Jobs

  • All Jobs
  • By Location
  • By State
  • International
  • By Industry
  • Top Companies
  • Job Titles

Job Types

  • Remote Jobs
  • Hybrid Jobs
  • Full-time
  • Part-time
  • Contract
  • Internships
  • Visa Sponsored

Experience

  • Entry Level
  • Mid Level
  • Senior Level
  • Executive
  • Remote Internships

Resources

  • Career Advice Hub
  • Top 10 Jobs
  • Solar Sales Salary
  • Become Solar Engineer
  • Salary Insights
  • CV Analyzer
  • Post a Job

Popular Job Locations

San Francisco
245 jobs
Boston
189 jobs
Denver
167 jobs
Austin
143 jobs
New York
298 jobs
Chicago
132 jobs
Seattle
201 jobs
Portland
98 jobs
Los Angeles
176 jobs
San Diego
87 jobs
Washington DC
203 jobs
Atlanta
112 jobs

Hot Remote Specializations

Project ManagerSolar SalesCustomer SuccessData EntryAll Data Entry
© 2026 NextGenEnergyJobs. All rights reserved.
Privacy PolicyTerms of ServiceAbout UsContact
  1. Home
  2. Jobs
  3. Director, Data Center Construction Quality Mission Critical
SB Energy logo

Director, Data Center Construction Quality Mission Critical

SB Energy
Location not specified
Full Time
Posted April 16, 2026
$190k - $220k
Data Center Infrastructure
~112 people viewed this recently
Apply Now

Application opens on company website

Job Description

The role involves overseeing and ensuring the quality of data center construction projects from start to completion, including developing quality management systems, conducting inspections, managing vendors, and coordinating commissioning to deliver reliable and high-standard mission-critical infrastructure.

Key Responsibilities

  • Manage and oversee the quality of data center construction from NTP to COD, ensuring compliance with established standards and requirements.
  • Establish and maintain a Quality Management System aligned with ISO 9001, including defining QA policies, inspection regimes, and escalation pathways.
  • Lead constructability, coordination, and quality reviews of electrical, mechanical, structural systems, and construction drawings to ensure conformance with project specifications.
  • Oversee project-level QA/QC teams and third-party inspectors, defining inspection and test plans for critical systems and materials.
  • Conduct root-cause analysis for defects, non-conformances, and field failures, and ensure timely resolution with corrective actions.
  • Perform quality control testing and inspections in accordance with contract requirements and best practices.
  • Ensure quality continuity during construction, testing, and commissioning phases, including validation of performance testing and punch-list resolution.
  • Lead handover and turnover processes, ensuring documentation and testing meet operational standards and client requirements.

Requirements

  • Bachelor’s degree in Engineering Electrical, Mechanical, or Structural required
  • 12 years in quality, engineering, commissioning, or construction leadership within Data centers, Semiconductor fabs, Power generation or other mission-critical infrastructure
  • Demonstrated authority interacting with EPCs, designers, and hyperscale clients
  • Proven ability to identify latent defects and systemic risks before they reach operations
  • Experience in design-build and fast-track delivery models
  • Technical knowledge of mission-critical electrical systems up to and including medium-voltage distribution
  • Technical knowledge of mechanical cooling systems for high-density and liquid-cooled environments
  • Knowledge of redundancy architectures N, N+1, 2N, distributed redundancy
  • Understanding of commissioning methodologies and failure-mode testing
  • Knowledge of applicable codes and standards including NEC, NFPA, IBC, IFC, IEEE, ASHRAE, ASME, Uptime Institute, TIA-942 concepts
  • Location preference for San Francisco Bay Area, CA or TX with hybrid work arrangement
  • Ability to establish and maintain a developer-wide Quality Management System aligned with ISO 9001 principles
  • Ability to define QA policies, inspection regimes, acceptance criteria, and escalation pathways for all projects
  • Serve as final technical authority on quality disputes between designers, contractors, vendors, and commissioning agents
  • Thorough understanding of EPC contracts, specifically the quality portion, to assist in developing onsite procedures
  • Experience qualifying and auditing critical equipment vendors such as switchgear, generators, UPS, cooling systems
  • Ability to review factory acceptance testing (FAT) protocols and results
  • Ability to establish performance benchmarks and corrective-action expectations for suppliers
  • Experience leading constructability, coordination, and quality reviews of electrical one-lines, protection studies, grounding, arc-flash mitigation, mechanical systems, structural systems, and verifying alignment with Basis of Design (BOD) and Owner’s Project Requirements (OPR)
  • Experience overseeing project-level QA/QC teams and third-party inspectors
  • Ability to define inspection and test plans (ITPs) for critical systems including medium-voltage distribution, switchgear, UPS, generators, cooling plants, CRAHs, CDUs, piping systems, fire protection, and life safety systems
  • Experience auditing contractor QC programs, subcontractor workmanship, and material traceability
  • Ability to lead root-cause analysis for defects, non-conformances, and field failures
  • Experience reviewing project submittal logs and quality control reports
  • Ability to lead weekly quality review meetings and provide weekly reports and metrics on project conformance
  • Experience performing quality control testing and inspections in adherence to contract requirements and best practices
  • Ability to manage and validate closure of non-conformances and CAPA (Corrective and Preventive Actions)
  • Experience driving lessons learned and continuous improvements during construction
  • Ability to oversee project turnover, including punch-list resolution, deficiency closure, and readiness for client acceptance
  • Experience ensuring quality continuity from construction into integrated systems testing (IST) and commissioning
  • Ability to validate functional performance testing reflecting real-world operating scenarios and failure modes
  • Ownership of the quality scope of the data center project from Notice to Proceed (NTP) to Commercial Operation Date (COD)
  • Experience co-leading Handover-Turnover (HOTO) processes prior to project hand-off to Operations & Maintenance (O&M)
  • Possession of a PE license (preferred)
  • Certifications in commissioning or quality such as CxA, PMP, ISO lead auditor (preferred)
  • Knowledge of applicable standards including NEC, NFPA, IBC, IFC, IEEE, ASHRAE, ASME, Uptime Institute, TIA-942 (formal certification not required)

Benefits & Perks

Base Pay - 190,000 - 220,000 (salary range)
Discretionary annual bonus
Comprehensive health and wellness benefits package
100% Company-Paid Medical, Dental, Vision for employees and dependents
401(k) with Company Match
Generous Paid Time Off
11 Paid Holidays
12 Weeks Paid Parental Leave
Life, AD&D, Long-Term Disability Coverage
Flexible Spending Accounts (FSA) for Medical, Dependent Care, Transit
Parking with company contributions
Flexible Work Arrangements (Hybrid Office Setup)
Monthly Reimbursement for Phone, Internet Data
Optional Legal Pet Insurance Plans
Device Purchase Support

Ready to Apply?

Join SB Energy and make an impact in renewable energy

Apply Now

Stay Updated on Sustainability Jobs

Get the latest renewable energy jobs and career tips delivered to your inbox.

Job Alerts

Get notified about new sustainability jobs

More at SB Energy

CSA Lead - Data Centers

Piketon$165k

Senior Manager, FP A

Redwood City$180k

Data Engineering AI Enablement Intern 2026

San Francisco Bay Area$0k

Jobs in Location not specified

Product Manager, Tanager

Planet$181k

Meteorologist Shift Wed-Sat, 2pm-12am CT

AlertMedia

Specialist Seller - Core, Enterprise

Samsara

More jobs at SB Energy

SB Energy logo

CSA Lead - Data Centers

SB Energy
PiketonPiketon, Ohio
Full Time
Apr 10
$115k-165k
SB Energy logo

Senior Manager, FP A

SB Energy
Redwood CityRedwood City, California
Full Time
Apr 17
$140k-180k
SB Energy logo

Data Engineering AI Enablement Intern 2026

SB Energy
San Francisco Bay AreaSan Francisco Bay Area, California
Internship
May 9
$0k-0k/hr

More jobs in Location not specified

Planet logo

Product Manager, Tanager

Planet
RemoteRemote
Full Time
May 13
$136k-181k
AlertMedia logo

Meteorologist Shift Wed-Sat, 2pm-12am CT

AlertMedia
RemoteRemote
TEMPORARY
May 13
Samsara logo

Specialist Seller - Core, Enterprise

Samsara
RemoteRemote
Full Time
May 13