Application opens on company website
World Wide Professional Solutions is a project solutions organization committed to implementing lean constructions, collaborative contracting, and execution approaches to enable breakthroughs in performance.
The Wastewater Treatment Project Manager is responsible for planning, coordinating, and overseeing the installation, commissioning, and turnover of water and wastewater infrastructure systems supporting hyperscale data center operations.
This role ensures systems are delivered on schedule, fully compliant, and aligned with mission critical performance standards, including reliability, maintainability, and environmental compliance.
You will operate in a fast-paced, zero downtime tolerance environment where execution quality and schedule adherence are critical to overall project success.
Key Responsibilities – Process Utility Systems (Water / Wastewater)
• Serve as the owner’s representative discipline lead for wastewater and water infrastructure systems across multiple active data center sites
• Oversee installation and execution of: Wastewater treatment systems, Industrial water handling and discharge systems, Cooling water support infrastructure as applicable
• Validate contractor scope, installation methods, and system compliance with approved drawings and specifications
• Lead coordination between contractors, design teams, and client stakeholders to resolve field issues quickly and effectively
• Drive design reviews, RFIs, submittals, and field clarifications related to process utility systems
• Perform regular site walkdowns to verify installation quality, identify deviations, and enforce construction standards
• Support QA/QC execution including inspection plans, testing procedures, and system validation
• Participate in commissioning, turnover, and startup activities to ensure systems meet operational readiness requirements
• Maintain accurate documentation including issue tracking, test records, and progress reporting
• Contribute to a commissioning-driven culture with strong focus on system performance and reliability
• Mentor junior staff and reinforce best practices across project teams
Requirements
• 5 to 8 years of construction experience in one or more of the following: Data centers, Industrial water or wastewater systems, Advanced manufacturing, Oil and gas or heavy industrial environments
• Experience supporting process utility systems, water infrastructure, or industrial piping systems
• Strong understanding of construction execution, sequencing, and coordination in complex environments
• Ability to operate in schedule-critical, fast-paced project environments
• Working knowledge of applicable codes and standards related to water and wastewater systems
• Proficiency with Microsoft Office and standard construction documentation platforms
Preferred Experience
• Experience on hyperscale or mission critical projects
• Exposure to commissioning and startup of utility systems
• Familiarity with owner’s representative or client-side project delivery models
• OSHA 30 or equivalent safety certification
• Experience working across multiple sites or large-scale programs
Education
• Bachelor’s degree in Construction Management, Engineering, or related field preferred
• Equivalent field experience will be considered
What Sets This Role Apart
• Full-time employment not a contract role
• Long-term project pipeline across multiple hyperscale data center builds
• Opportunity to work within an owner’s representative structure, influencing outcomes rather than just executing scope
• Exposure to large-scale, technically complex, mission critical infrastructure
• Competitive compensation, full benefits, and career progression
World Wide Professional Solutions (WWPS) is committed to providing Equal Employment Opportunity in its personnel policies and practices. It is WWPS' policy to recruit, hire, train and promote Team Members and applicants for employment without regard to race, color, creed, religion, age, sex, marital status, registered domestic partner status, genetic information, sexual preference, sexual orientation, gender (including gender expression and gender identity), pregnancy (including childbirth or related medical conditions, including breastfeeding), military service, national origin, ancestry, citizenship, physical disability, mental disability, veteran status or any other protected classification under federal, state, or local law. All such decisions are based on (1) individual merit, qualifications, and competence as they relate to the particular position, and (2) promotion of the principle of equal employment opportunity.
All other terms and conditions of employment, such as compensation, benefits, transfers, layoff, return from layoff, training, education, and social and recreational programs, are administered without regard to the characteristics described above. To this end, WWPS complies with all provisions of Title VII of the Civil Rights Act of 1964 as amended, all of the rules, regulations and relevant orders of the Secretary of Labor, and all similar state and local laws.
The salary range for this full-time role is $153,100.00-$214,366.70 per year. Ranges are determined based on the position, geography, client and industry experience and level, and represent a good faith effort to provide a fair and equitable salary. This range reflects base salary only, and not the total compensation package. World Wide Professional Solutions reserves the right to pay more or less than the posted range, depending on a candidate’s experience, skills, and qualifications, including client requirements.
In addition to base salary, WWPS offers a comprehensive benefits package including:
• Medical
• Dental Insurance
• Vision Insurance
• 401(k)
• 401(k) Matching
• Paid Time Off
• Paid Holidays
• Short and long-term disability
• Employee Assistance Program
• Company-Paid Parental Leave
• State Paid Family and Medical Leave (where applicable)
• Lifestyle Spending Account (LSA)
• Professional Development & Tuition Assistance
#WWPS
#LI-PT1
Apply directly on Cumming Group's site
New jobs across data centers, grid, nuclear, storage, generation, and renewables. One email a week.
Get alerts for jobs like this one